EasyManua.ls Logo

multivac C100 - Maintenance recommendation; Entire machine - Perform a wipe test

multivac C100
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
Maintenance schedule
13.05.2014 59
Page Complet
ed
Vacuum system Check
60
Every 1000 opearating hours or yearly
Page Complet
ed
Vacuum pump Oil change
61
Vacuum pump Exchanging the air de-oiling element
61
Entire machine Check the age
61
7.2 Maintenance recommendation
7.2.1 Entire machine - Perform a wipe test
¾ Check the result of the cleaning and disinfection by means of a
wipe test.
See the company cleaning guidelines and recommendations, see
Section 6 "CLEANING".
7.2.2 Entire machine - Perform a wipe test
¾ Check the result of the cleaning and disinfection by means of a
wipe test.
See the company cleaning guidelines and recommendations, see
Section 6 "CLEANING".
7.2.3 Vacuum pump - Perform the pump protection func-
tion
¾ Perform the pump protection function, for this switch off the ma-
chine, see Section 4.2 "SWITCHING OFF THE MACHINE".
7.2.4 Entire machine - Visual inspection
¾ Check the entire machine exterior for damage.
¾ Check that all safety labels are present.
¾ Check that all safety devices are attached and undamaged.

Table of Contents

Related product manuals