7
Mapping and Defining the Input
Output Devices
NOTE Munters recommends that a trained technician perform the following operations.
Mapping Devices
Temperature Sensors
Ventilation Devices
Sensors
Heating Devices
Defining the Cooling Devices
Potentiometers, Inlets, Tunnel Doors, Outlets
Defining the Sprinkler
Defining the Same As Relays
Defining the Same As Analog Ports
Defining the Timer
Defining the Auxiliary Input
Defining the Measuring Fan
Feeding Devices
Trio RPS
7.1
Mapping Devices
After wiring devices to the Trio, each device must be mapped and then defined. Mapping
and defining devices enable the system software to control each devices functionality.
CAUTION Mapping MUST match the physical wiring! An error message appears if the
physical device is not wired to the relay or port as defined on the mapping screen.

Table of Contents

Other manuals for Munters Rotem Trio

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Munters Rotem Trio and is the answer not in the manual?

Munters Rotem Trio Specifications

General IconGeneral
BrandMunters
ModelRotem Trio
CategoryFarm Equipment
LanguageEnglish

Related product manuals