EasyManua.ls Logo

Nabco GT 710 - Chapter 6: Install the Second Half of Swing Arm; Section 6 a: Set Pre-Load

Default Icon
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GT 710-8710 Swing Door System Low Energy Operator www.NabcoEntrances.com
Part #15-10683 Rev. 9-24-14
6-18 Install the Second Half of Swing Arm
CHAPTER6:INSTALL THE SECOND HALF OF SWING ARM
Secon 6 a: Set Pre-Load
Proper Preload is critical for the Control/Operator to open/close the Swing Door
correctly.
Power must be turned OFF during the Swing Arm installation.
Locate pre-load numbers 1-4 on the Bottom of the Operator Spindle. Please see .
a. Pre-load numbers 1-4 mark the correct installation position for pre-load.
DN 1120
Pre-Load Numbers
Pre-Load Mark
21
4
3
21
3
4
Figure 6-1 Pre-Load Numbers
Obtain the Swing Arm.
Slide the Swing Arm onto the Operator Spindle by aligning the appropriate pre-load number to the
pre-load mark on the underside of Swing Arm:
RH Outswing LH Outswing RH Inswing LH Inswing RH Inswing-0 Reveal LH Inswing-0 Reveal
1 2 3 4 4 3
Please see,  or , or 
Figure 6-2 Preload: Outswing Arm
WARNING
CAUTION

Other manuals for Nabco GT 710

Related product manuals