UPM 2000
Netech Corporation
110 Toledo St, Farmingdale, NY 11735
http://www.Netech.org
25
Chapter 3: Installation & the Operating Environment
Inside This Chapter
• Unpacking and Inspection
• Operation
• UPM 2000 Systems Check
• Beginning Ultrasound Power Measurements
• Using the Universal Transducer Clamp Assembly and
Centering Rings
• Ultrasound
Unit Testing
• Using the RS232 Port
1-800-547-6547
3