EasyManua.ls Logo

Nice SLH400

Nice SLH400
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26 – ENGLISH
9.1.9 Connecting the Oview programmer
The control unit has a BusT4 connector to which the “Oview
programmer can be connected, through the IBT4N interface.
The programmer allows for fully and rapidly managing the in-
stallation, maintenance and diagnosis of the entire automation.
To access the connector, proceed as shown in the gure and
connect the connector to its relevant slot.
42
The Oview may be connected to multiple control units simulta-
neously (up to 5 with no particular precautions, up to 60 with the
warnings stated) and may be left connected to the control unit
during normal operation of the automation. In this case, it can be
used to directly send commands to the control unit through the
specic “user” menu.
It is also possible to update the rmware. If the control unit has
a radio receiver belonging to the OXI family, the “Oviewcan
be used to access the transmitter parameters memorised in the
receiver.
For more detailed information, consult the respective instruction
manual and the “Opera system book” manual.
9.1.10 Connecting the Solemyo solar energy system
f
When the automation is powered by the “Solemyo”
system, IT MUST NOT BE POWERED by the elec-
tricity grid at the same time.
To connect the “Solemyo” system:
1. remove the plastic protection (A) with the aid of a screw-
driver
2. insert the relative connector (B) on the control unit.
B
A
43

Table of Contents

Related product manuals