7 Filling the tanks with processing and replenishment solutions
78
(5) Make sure that the processing solution tanks are completely empty, and then close the drain valves.
(6) Wash each tank in the same procedure.
3. Attach the processing rack (No. 1).
4. Move the rack stoppers to lock the processing racks.
5. Pour the processing solution into the sub-tank.
Pour each processing solution into the sub-tank in the reverse order of the developing process.
The level of the processing solution will fall down after the circuit breaker was turned on and the solution was
circulated. So, leave the solution to add.
IMPORTANT
Do not splash the processing solution over the place other than the sub-tank in which the solution is
being poured.
Pour in the processing solution slowly to prevent it from producing bubbles.
6. Attach the filter pipes securely.
Align the projection of the filter pipe with the sub-tank cutout and insert slowly. Insert the bottom end of the filter
pipe into the hole on the bottom of the sub-tank. Then turn the filter pipe clockwise until it stops to secure it.
Rack stopper
G068927
Sub-tank
G068947
Projection
Cutout
Filter pipe
G068867