230
Initial Setting Level Section 5-9
• This parameter sets the final bank number for executing program opera-
tion.
â– Related Parameters
Program pattern (initial setting level): Page 229
• These parameters set the output periods. Set the control periods taking
the control characteristics and the electrical durability of the relay into
consideration.
• For standard control, use the Control Period (Heating) parameter. The
Control Period (Cooling) parameter cannot be used.
• When the heating control output is a current output, the Control Period
(Heating) parameter cannot be used.
• For heating/cooling control, the control period can be set independently
for heating and cooling. The Control Period (Heating) parameter is used
for the heating control output, and the Control Period (Cooling) parameter
is used for the cooling control output
â– Related Parameters
PID ON/OFF (initial setting level): Page 228
pbnk Valid Program Bank
The Program Pattern parameter
must not be set to OFF.
Setting range Default
0 to 7 7
Function
Setting
See
See
cp Control Period (Heating)
The cooling control output and heat-
ing control outputs must be assigned
to relay outputs, voltage outputs (for
driving SSR), or SSR outputs.
The control must be set to 2-PID
control.
For the Control Period (Cooling)
parameter, the control must be set to
heating/cooling control.
c-cp Control Period (Cooling)
Parameter name Setting range Unit Default
Control Period (Heating) 0.5 or 1 to 99 Second 20
Control Period (Cooling) 0.5 or 1 to 99 Second 20
Function
Setting
See
See