This section describes the setting procedure for automatically loading the V+ programs and V+ global
variables to the Robot Integrated CPU Unit when its power is turned ON.
1 Select RobotControlSettings from the device list in the Multiview Explorer.
2 Click Configurations and Setup in the Multiview Explorer.
Setting items are displayed under Configurations and Setup in the tree.
3 Double-click Save Configuration.
The Save Configuration tab page is displayed in the Edit Pane.
3 Implementation Example of Static Pick-and-place Equipment
3-68
NJ-series Robot Integrated System Startup Guide (O049)