FT
-
3500 ELECTROMAGNETIC FLOW METER
ONICON Incorporated 727.447.6140 Page 48 onicon.com
5.3 START-UP AND COMMISSIONING WORKSHEET
Please read all installation (Sec 3) and commissioning (Sec 4) instructions carefully prior to proceeding with these steps.
Use the following worksheet for checking o the commissioning steps and recording measured values. The following
steps require ow in the pipe. Flow signal readings should be taken while holding the ow rate constant, if possible.
Otherwise, take the various output readings as quickly as possible.
STEP TEST/MEASUREMENT S/N: _________ S/N: ________ S/N: ________ S/N: _________
1. Meter location:
2. Conrm pipe size: ___________ ___________ ___________ ___________
3. Insertion depth and
orientation:
4. Control system
programming:
5. Match display or Btu
meter serial number
(S/N):
___________ ___________ ___________ ___________
6. Signal connections
veried:
7. Supply voltage veried: ___________ ___________ ___________ ___________
8. Connect power:
The following steps require ow in the pipe. Flow signal readings should be taken while holding the ow rate con-
stant if possible, otherwise, take the various output readings as quickly as possible.
9. Frequency output(s):
Avg = green
Average frequency (Hz):
Average frequency (VDC):
Calculated ow rate:
___________Hz
_________VDC
_________GPM
___________Hz
_________VDC
_________GPM
___________Hz
_________VDC
_________GPM
___________Hz
_________VDC
_________GPM
10. Analog or pulse output(s)
4-20 mA signal:
2-10, 1-5, 0-10 or
0-5VDC Signal
(select one):
Scaled output interval:
Calculated ow rate:
___________mA
_________VDC
_____________
_________GPM
___________mA
_________VDC
_____________
_________GPM
___________mA
_________VDC
_____________
_________GPM
__________mA
_________VDC
_____________
_________GPM
11. Flow rate displayed
by control system:
_________GPM _________GPM _________GPM _________GPM