EasyManua.ls Logo

Palfinger Clocktower PK2400 TK - Page 100

Palfinger Clocktower PK2400 TK
123 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Crane operation
94
Putting basket in operation
For basket operation it is required that the lower load block is put down on the intended place before.
Put down the lower load block on the provided panel and
disassemble it.
Mount the provided chain with scale to the shackle and connect it
with the basket.

Table of Contents

Related product manuals