EasyManua.ls Logo

Palfinger Clocktower PK2400 TK - Unfolding the Crane

Palfinger Clocktower PK2400 TK
123 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparing for crane operation
78
Danger! If loads are not lifted from directly below the pulley head in
rope winch operation:
The load may swing uncontrollably;
The rope, the pulley head and the pulley can be
damaged;
The rope may run out off the roller of the pulley head;
The rope may break;
The load may fall down. There is then an acute risk of fatality for the
operator and others.
Danger!
Damaged ropes can break during rope winch operation. There is an
acute danger of accident.
Unfolding the crane
Set the key switch to remote operation.
Prerequisites for unfolding the crane
No bystanders or obstacles are in the movement range of the crane.
Danger!
Not maintaining the minimum distances creates an acute risk of
fatality for the operator and others.
The operator must have full view of all crane movements.
All safety notes of chapter 2 shall be observed.
Remote control
Danger!
When the operator is in the folding/unfolding area of the crane there is
an acute risk of fatal injury.
Choose a position outside the danger zone of the crane.

Table of Contents

Related product manuals