EasyManua.ls Logo

Palfinger Clocktower PK2400 TK - Starting the Crane

Palfinger Clocktower PK2400 TK
123 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparing for crane operation
76
Starting the crane
Note!
Only one person shall operate the crane at a time.
Operator station
Switch on the main switch (ON).
Switch main operation to (1).
Push the lever to Normal (1).
How to work with radio remote control
Unlock the cylinders for parking position.
Lift main boom
Extend outer boom

Table of Contents

Related product manuals