Panasonic Eco Solutions Nordic AB
MEW01622 Rev: - EBL128 Planning Instructions V2.0.x
1
Table of contents
1 Introduction________________________________ 8
2 Definitions / Explanations ___________________ 10
2.1 PESN AB _______________________________________ 10
2.2 Alarm point ______________________________________ 10
2.2.1 Smoke detector _______________________________ 10
2.2.2 Sensor ______________________________________ 10
2.2.3 Analog detector _______________________________ 10
2.2.4 (Analog) Sensor Base (ASB) ____________________ 10
2.2.5 Conventional detector __________________________ 10
2.2.6 Conventional Detector Base (CDB) _______________ 10
2.2.7 Addressable __________________________________ 10
2.2.8 Old detector __________________________________ 11
2.2.9 Conventional zone line _________________________ 11
2.2.10 Addressable zone interface ______________________ 11
2.3 Output unit ______________________________________ 11
2.4 Output / Control output _____________________________ 11
2.5 Short circuit isolator _______________________________ 11
2.6 Display unit (D.U.) ________________________________ 11
2.7 COM loop _______________________________________ 11
2.8 Control Unit (C.U.) / C.I.E. __________________________ 11
2.9 Fire Brigade Panel (FBP) ___________________________ 11
2.10 Control panel (CP) ________________________________ 12
2.11 LED ____________________________________________ 12
2.12 External Indicator (LED) ___________________________ 12
2.13 Display / LCD ____________________________________ 12
2.14 Door open / Key switch _____________________________ 12
2.15 Site Specific Data (SSD) ____________________________ 12
2.16 Software (S/W) / Firmware / System program ___________ 12
2.17 EBLWin ________________________________________ 12
2.18 Web-server ______________________________________ 12
3 Overview _________________________________ 13
3.1 The EBL128 c.i.e. _________________________________ 13
3.1.1 Expansion boards _____________________________ 13
3.1.2 Power supply _________________________________ 13
3.2 S/W Versions ____________________________________ 13
3.3 Documents ______________________________________ 13
3.4 Applications _____________________________________ 14
3.5 PC S/W _________________________________________ 14
4 Control & Indicating Equipment _____________ 15
4.1 COM loop _______________________________________ 17
4.1.1 A single break (cut-off) on the COM loop __________ 18
4.1.2 Several breaks (cut-offs) on the COM loop _________ 19