L2
L1
L2
L1
L1 N L2
Wiring Connection on the EV-SBWiring Connection on the EV-SB
7.5 Connect Solar Conductors to EV-SB
7.6 Connect Non-Backup Conductors to EV-SB
7.7 Connect ESS 1 Conductors to EV-SB
7.8 Connect Backup Conductors to EV-SB
45
After installing a main breaker
Before installing a main breaker
L1 L2
Backup Breaker
44