58 - PVD 3674_GB_K Series_CE-November 2016.Docx
4. COMMISSIONING, USE AND MAINTENANCE
4.1. Instructions for commissioning, use and maintenance
4.1.1. Equipment delivery
All kits are strictly controlled during manufacturing, before shipping.
While receiving it, it is necessary to verify kit condition and if it has not been damaged
in transit. Remove it carefully from its packaging. Verify that the data written on the
label are the same as the ones on the acknowledgement of order, and that all
documents or needed accessories for user are present in the packaging.
Warning: In case of damaged material during the transport, the
recipient must immediately make reservations to the carrier through
a registered mail within 24 h..
4.1.2. Handling
Kit motors are delivered in two part, rotor and stator divided.
DANGER: Do not handle the stator with the help of electrical cables
or use any other inappropriate method. Use non-magnetic material
to handle rotor.
Attention: Rotors have strong permanent magnets. It creates strong
attraction forces that can crush fingers or hands. Firmly hold the rotor
and move away all magnetic parts.
Caution: Clean the working area of all ferromagnetic part such as
tools, screws, steel particles. Use wood table to work or make
machine assembly.
4.1.3. Storage
Before being assemblied, the kith has to be stored in a dry place, without rapid or
important temperature variations in order to avoid condensation.
During storage, the ambient temperature must be kept between -20 and +60°C.
If the kit has to be stored for a long time, verify that the rotor and stator are coated
with corrosion proof product.