Parker Hannifin S.p.A. - Divisione S.B.C. LVD User’s Manual
99
Revision history
Rev 1 - First issue August 98
Rev 1.1 - December 98
- Chapter 1.1 General information.
- Chapter 2.6 Power connection diagrams: added transformer sizing formula.
- Chapter 2.8 Signal cable connection diagram.
- Chapter 6 CANBUS: modified identifier SBCCAN.
Rev 1.2 - January 99
- Contents: new chapter 3.14, appendix I and page numbers.
- Chapter 3.3 Basic parameters: added b41.15.
- Chapter 3.14 Digital locking + Positioner: new operating mode 13.
- Chapter 3.15 Position control with CanBus or electronic Cam: added b70.6.
- Chapter 3.16 Block diagrams: modified operating mode 9, added operating mode 13.
- Chapter 3.17 Other useful functions: last paragraph of table function,
homing function also with operating mode 13.
Virtual axis function.
- Added Appendix I: IOBOX .
Rev 1.3 - January 99
- Appendix I: IOBOX: fixed mistake on power-supply connections.
Rev 1.4 – September 00
- Appendix I: IOBOX: fixed mistake on canbus connections.
Rev 1.5 – November 00
- Chapter 4.3 Programming with PC2LVD fixed mistake on serial link connections.
Rev 1.6 – November 01
Chapter 2.5 Add caracteristics of 24V power supply
Set and complete the layout structure of the document
Rev 1.7 – November 02
Chapter 3.10 Add spec at Pr52