5 Commissioning [specialist]
2021/03 99E13331xx-mub-en - V07 15
5 Commissioning [specialist]
Risk to life and limb due to electric shock!
Be sure to perform all the measures listed in the
Mounting and
installation
section before starting the first commissioning.
When the controller is connected for the first time, the message "Please carry out the first start-
up" is shown on the display.
After confirming with "Yes", the commissioning menu is displayed where you can successively
make the desired general settings.
5.1 Language
Deutsch (DE)
Polski (PL)
English (ENG)
Français (FR)
Sets the desired menu language.
5.2 Controller mode
CONTROLLER M O D E
Single controller
Client (ID1)
Server 1 (ID2)
Server 2 (ID3)
Sets the available type of controller.
The menu item
Single controller
should be selected if you
want to put into operation only one domestic hot water
module. If you connect multiple domestic hot water
modules (2 - 4 modules) hydraulically in parallel, these
controllers are called cascading.
The controllers are connected via a bus line with each other and are called
client
or
server
.
5.3 Date
SET DATE
17 – 03 – 2020
Day
Sets the current date.
First set the day, the month and finally the year.