Workshop Manual, TPD 1458E, issue 3 - Perkins Confidential: Green 103
14
400 Series
Electrical equipment 14
Electrical shut off solenoid
To remove and to fit Operation 14-1
Special requirements
Notes:
l The washer is fitted with an integral “O” ring.
l Always use a new washer on assembly.
Engine Torque Nm (lbf ft) kgf m
All models Solenoid 17 (12) 1,7
H1111