1 Introduction
4
6. Watertight junction boxes conforming to NEMA 4X
Maximum No. of
Cable Junctions
in Enclosure
7. Watertight cord grips
8. Shrink tubing for cable connectors
9. RTV adhesive/sealant for cable connectors
1.5 Material and Equipment Normally Supplied by Contractor
Each system may require the installing contractor to supply the following items:
1. Electrical conduit, junction boxes and wiring, as required.
2. Ohmmeter for testing.
3. Hot air gun for shrink tube application on connector assemblies.
NOTE:
All probe lead and communication cable should be run in conduit to protect the cable from physical
damage. In an area subject to strong electrical interference, grounded metal conduit is recommended.
Contact PermAlert for additional information.