i
Index
Index
A
accessories, optional A-1
ambient conditions 3-2
operating conditions 3-2
technical specifications 7-2
amplitude error 4-2
high pass filter 4-3
amplitudenfrequenzgang 4-3
ANALOG OUT
jack at the laser vibrometer
3-4
signal output, technical specifications 7-2
analogue signal acquisition, high pass filter 4-3
aperture diameter 7-5
area of application, PDV 2-1
area ventilation 3-2
assembly 3-2
the tripod VIB-A-T01 3-6
the tripod VIB-A-T02 3-6
assemly
laser vibrometer
3-5
B
basics, measurement procedure B-1
battery charger
12V-connecting plug
A-2
operating conditions 3-2
battery level indicator, battery is low 5-6
battery operation
Batt. empty, warning on the display
6-2
electrical connection 3-7
beam diameter 7-5
beam shutter
control elements
3-3
on the laser vibrometer 5-1
block the laser beam
before measurements
5-1
control elements 3-3
Bragg cell 2-2
Butherworth, 3rd order 4-3
C
cabling, functional test 3-7
calibration period, recommended 7-2
calibration, laser vibrometer specifications 7-2
carrier bag PDV-BS
components
A-1
cavity length
optimal stand-off distance
4-4
technical specifications 7-5
clamping screw, at the focus ring 3-3
cleaning
housing surfaces
3-2
the front optic 3-2
components
unpacking
3-1
components, carrier bag PDV-BS A-1
configurations, change 3-3
connecting cable 3-2
connecting plug
battery chargerLadegerät
A-2
PDV-100 3-4
control processor 5-3
cooling 3-2
cursor
at the display
5-2
move 3-3
D
detector frequency, basics B-1
digital filter Principe 4-2
DIGITAL OUT
jack at the laser vibrometer
3-4
DIGITAL OUT signal output, technical
specification
7-3
dimensions
laser vibrometer PDV-100
7-6
mountain plate VIB-A-P07 7-8
directionally sensitive interferometer, basics B-2
display
at the laser vibrometer
3-3
battery level indicator 5-6
cursor 5-2
display sample 5-2
menu structure 5-3
overrange indicator 5-5
setting the parameter 5-2
display temperature in the service mode 5-4
disposal of the instrument 1-1
Doppler effect 2-2
Doppler frequency, basics B-1
E
electrical connection
battery operation
3-7
mains operation 3-7
electrical installation 3-7
electrical safety, standards applied 7-1
emission, EMI-standard 7-1
error in delivery 3-1