Step 1: Plan for Installation
There are several planning factors to be considered prior to installing the
QuickBridge.11 system. In addition to selecting the installation site, you should:
Calculate:
Required RSL and fade margin to achieve availability objectives
Required path availability
Anticipated Multi-Path Reection Points
Determine:
System Frequency Plan
Required Antenna Mounting Height to obtain proper Path Clearance
Required Transmission Line Types and Lengths
Plan for:
The unit’s continuous power consumption needs
Lightning protection and system grounding
Hardware mounting
Cable installation including egress
Pre-testing Equipment (back-to-back test procedure)
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪