EasyManua.ls Logo

Quick MILL ELEVATE R - Page 270

Quick MILL ELEVATE R
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
270
Italiano
English
Français
Deutsch
Steam delivery
1. Wait until the heating light switches off (l) and make sure that the
pressure indicated on the boiler gauge is over 0.8 Bar.
2. Open the steam valve (d) for a few seconds and discharge a little steam into
the drip tray (i) then immerse the steam wand (e) in the liquid to be heated
and open the tap, when the required temperature is reached, close the tap.
After heating the beverage, always discharge a little steam from
the wand to clean the spray holes.
For this model, without adjustment PID, the machine temperature
management is by means of a specific pressure switch.
Hot water delivery
1. Place the container to collect the water under the hot water wand (g).
2. Open the water tap (f) to deliver the hot water.
3. When the required level is reached close the water tap.

Table of Contents

Related product manuals