EasyManua.ls Logo

Rae RAEGuard 2 PID - Page 31

Rae RAEGuard 2 PID
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RAEGuard 2 PID User’s Guide
26
Zero/Fresh Calibration
Your options are indicated along the bottom of the screen:
Press [+] to start.
Press [MODE] to quit and return to the menu.
If you choose to start zero/fresh air calibration, you see this message:
Please apply zero gas…
Connect the zero gas, start its flow, and then press [+]. There is a
countdown as calibration is performed.
Span Calibration
Your options are indicated along the bottom of the screen:
Press [+] to start.
Press [MODE] to quit and return to the menu.
If you choose to start span calibration, you see this message:
Please apply gas…
Connect the calibration gas, start its flow, and then press [+]. There is
a countdown as calibration is performed.
Calibration Gas (Advanced Mode)
You can set the gas that you want as your calibration gas. Calibration
gases are organized in two lists:
Last Ten is a list of the last ten gases used by your instrument.
The list is built automatically and is only updated if the gas
selected from the Gas Library is not already in the Last Ten. This
ensures that there is no repetition.

Table of Contents

Related product manuals