c
_-
(4)
Check the wiring through ZCT on the IDLE
CONTROL UNIT.
*
Single Voltage Type
Make sure that an output wire from main coil is
passing through the ZCTon the IDLE CONTROL
UNIT.
*
Dual Voltage Type
Check that two output wires (black wire and red
wire) from main coils are passing through the
ZCT
on
the IDLE CONTROL UNIT in the same
direction.
(5)
Checking the IDLE
CONTROL
UNIT
Check the resistance between five leads of
IDLE CONTROL
UNIT
with circuit tester.
Terminal
number
of
the
IDEL
CONTROL
UNIT
I
IDEL
CONTROL
UNIT
I
I
i
Fig.
11-15
Fig.
17-16A
Fig.
17-168
Apply
red
(plus)
needle
of
the
circuit
tester
~~ ~
Table.
11-4
NOTE
:
The resistance readings vary depending
on
the @pes
of
circuit testers. The above table shows
an example
of
the resistance readings measured by
an
ordinary analogue circuit tester witb
1.5
volt battery power source. It
is
advisable for you to check the resistance readings using your
standard circuit tester and revise the checking table.
-
59-

Other manuals for Robin RGV2800

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Robin RGV2800 and is the answer not in the manual?

Robin RGV2800 Specifications

General IconGeneral
BrandRobin
ModelRGV2800
CategoryPortable Generator
LanguageEnglish

Related product manuals