EasyManua.ls Logo

Rotax 912-UL - Dimension Sheet 4, Valve Train

Rotax 912-UL
83 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
L1.4) Dimension
sheet
4: Valve
train engine
no.
Valve
train
1)
Checking of actuating
position
on hydraulic
tappets
The nominalworking
point
is
positioned
in
the
mid-range
of the
possible
travel.
Checking
by
measuring valve
clearance
with
tappets empty
(assembly
state) and
pushrods
pressed
down.
The respective
cylinder
must be in
ignition
T.D.C. range.
no.
of cylinder
1 2 3 4 nominal
Tappet
clearance
inlet
2+5mm
.079+.197in
ex-
.
ilausl
remarK
2) Valve
timing at
1
mm valve lift
Set valve
train
free
of
play
by distance
piece
and take
readings
with
cylinder
1 in ignition
T.D.C.
and
at
1 mm
valve
lift.
Priorto
checking
of
valve
timing
furnish
engine
with
dialgauge
support and angle
finder.
Tester:
date:
exhausl
openr
B.B.D.C.
inlet opens
T.D.C
9X
haustcloses
T.D.C.
inlet closss
A.B.D.C.
nominal
44o
+
48o 2ob.
+
2oa. 2ob.
+
2oa. 44o
+
48o
actual
remarks
ft6'pt!:Uf:
77,,,,,,"1992

Other manuals for Rotax 912-UL

Related product manuals