5.
DEBUGGING
Figure 5.1
LED indicators
3029
HYBRID SOLAR INVERTER INSTRUCTION MANUAL
5.1 Sta Up and Shut Down Inveer
5.1.1 Start Up
5.1.2 Shut Down
(1)Connect the AC circuit breaker
(2)Connect the DC circuit breaker between inveer and batte(if applicable)
(3)Turn ON the batte(if applicable)
(4)Turn ON the DC switch on the inveer
(5)Install the communication module into the inveer
(6)Setup the initial setting for inveer on eSAJ Home
(7)Obsee the LED indicators on the inveer to ensure the inveer is running properly
Automatically shut down, when the solar light intensity is not strong enough during sunrise
andsunset or the output voltage of photovoltaic system is less than the minimum input power
of inveer, inveer will shut down automatically.
5.2 Introduction of
LED Indicator
Shut down manually, disconnect AC side circuit breaker rst, if multiple inveers are connected,
disconnect the minor circuit breaker prior to disconnection of main circuit breaker. Disconnect
the DC switch after inveer has repoed grid connection lost alarm.