HYBRID SOLAR INVERTER INSTRUCTION MANUAL
Note: The hybrid inveer is with expo limitation function, which can be realized by connecting
SAJ recommended sma meter to the hybrid energy storage system. Users can contact SAJ for
fuher details for the sma meters. If users have no intention to set the expo limitation func -
tion, please ignore chapter 4.8.4.
If users have purchased the sma meter that recommended by SAJ, before setting the expo
limitation function, users shall connect the meter to the system as below:
4.9
4.8.2 RJ45 Pin Po Denition
System Connection
4.8.4
Sma Meter Connection
4.8.3
Figure 4.14
Inse the communication cable
9-Pin serial po
Figure 4.15
Connection of communication cable
Figure 4.16
Sma meter wiring
Open the waterproof cover, pass the crimped communication cable
through waterproof cover, inse cable to the corresponding communica -
tion po, then tighten waterproof cover with screws.
2625
The system connection in Australia and New Zealand is as below, the neutral cable of AC
and backup side must be connected together for the safety reason.
Note: DO NOT connect the PE terminal of BACKUP side.
/BMS
EMS/METER
PORT1PORT0