Troubleshooting
4-36 Samsung Electronics
4-4-3 Preliminary Inspection
■ Auto Inspect Order
The auto inspect mode is run in the following order.
t
Inspects installation conditions such as indoor unit, outdoor unit pipe works, communications cable, power cable, amount of
refrigerant filled, etc.
t
Modifies unsatisfactory parts after evaluations based on the inspection sheet.
t
Auto inspect mode will run after preliminary inspection is finished. Data and result report will be issued using S-net pro.
■ Fill out installation check card and preliminary inspection sheet
t1MFBTFGJMMPVUUIFJOTUBMMBUJPODIFDLDBSEBUUBDIFEUPUIFDPOUSPMCPYPGUIFPVUEPPSVOJU
t5IFSFJTBQSFMJNJOBSZJOTQFDUJPOTIFFUQSJOUFEPOUIFCBDLPGUIFDBSE1MFBTFGJMMUIJTPVUBOETUPSFJUJOUIFTUPSBHFBSFBJOTJEFUIF
control box.
Preliminary Inspection
t*OTQFDUJOTUBMMBUJPOPGJOEPPSBOEPVUEPPS
units
t'JMMPVUDIFDLDBSEBOEQSFMJNJOBSZ
inspection sheet
t*OTFSUQPXFSTVQQMZ
t*OTUBMMBOETFUVQ4OFUQSP
t.*$0.VQEBUFXIFOOFDFTTBSZ
Operation
t3VOQJQFJOTQFDUJPONPEF)3
t3VOBVUPJOTQFDUNPEF
t4BWF4OFUQSP%BUBBOEDIFDLSFTVMU
report
t$IFDLSFQBJSFSSPSPSJOTQFDUJPOJUFNT
if
they occur
➞ Re-issue result Report
End
t&OEOPUJGJDBUJPO
$9;&6+B$BaLQGG