Users manual Coffee on the Spot
Scanomat A/S Vibe Allé 3. Postboks 131 DK-2980 Kokkedal (Copenhagen) Reg.nr. 236.990
Tel: (+45) 49 18 18 00. Fax: (+45) 49 18 01 18
24
10. Test the coffee brewer.
Charging:
When the machine has been in operation for 3-4 hours it must be returned to its “charging station” where
water will be taken into the machine, the water in the water tank will be heated, and the built in batteries will be
charged. On the display it is always possible to read how many cups that can still be served before filling up
will be necessary as well as the actual temperature in the water tank is indicated.
Charging Procedure (during working hours)
1) The guiding wheels are locked (H).
2) Take water into the machine (the hose with waterconnector (which is part of the delivery) is pressed
into the waterconnector of the machine (D)). Water supply can be connected with full water pressure
on the hose.
3) Switch on mains power (230 V). While the machine is heating up it uses 2300 Watt. Therefore, it is
very important to use a mains socket, which is not part of the fuse bank to which other heavily
consuming equipment is connected.
4) The machine will now start to take in water, heat it up, and charge the batteries (heating time approx.
45 min.).
5) While charging, the machine can be cleaned and filled up with ingredients.
Cleaning: place a small pot or the like under the coffee brewer’s outlet spouts (see also “Daily
Maintenance”).
a. Push the “service key” on the inner side of the door of the coffee brewer.
b. Push “clean” – the machine will then start a cleaning programme.
c. When the machine has finished the cleaning programme, push the “service key” once again.