EasyManua.ls Logo

Schmalz SCH-S - Inserting a New Chain

Schmalz SCH-S
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
20 | EN www.schmalz.com 30.30.01.01117/06
Table 5: Controller pin assignment
Plugs for connecting chain hoist and controller
Plug
Function
Control pendant
cable
Comfort Y-cable
1
Power supply
1
Pink
2
Chain hoist up
2
Purple
3
Chain hoist down
3
Green
4
Chain hoist fast
4
Yellow
5
Emergency stop
10
Orange
ATTENTION
Incorrect operating voltage / frequency
Material damage to chain hoist
Before connecting the chain hoist, check that the operating voltage /
frequency specified on the type plate matches the available voltage
supply.
The power must be supplied with a clockwise rotation field. Check the
rotation field before starting operations.
Open the terminals (Fig. 8).
5.2 Inserting a New Chain
Remove the old chain
1. Disconnect the chain from the main
body.
2. Unscrew the end stop (1).
Fig. 8
1
1
2
3
4
5

Table of Contents