EasyManua.ls Logo

Seaga Quick Break Combo QB2000 - Page 7

Seaga Quick Break Combo QB2000
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7QB2000 9.2022 vers 1.0
Inial Setup
Moving the Vending System
Your QB218B system should never be moved with product or coins loaded, it should be completely empty and
any moving parts must be secured.
The system can be located as close as 2 inches to the back wall but requires 6 inches clearance on either side
for the doors to open properly while you service the machine.
Aer locang your vending system, plug in the power cord and the system will turn on.
CAUTION!
Dierent countries may have dierent power arrangements. Ensure that the machine is
properly grounded before operang.
CAUTION!
If the power cord is damaged, it must be replaced by the manufacturer, authorized service
agent or a similarly qualied person to avoid electrical hazards.
ATTENTION!
This dispensing machine is very heavy. Ensure that sucient personnel are available for liing
or transporng the machine. Use proper liing procedures and equipment.
CAUTION!
Certain components of this machine are sensive to stac electricity. Precauons for handling
sensive devices should be observed when handling these items.
ATTENTION!
Leave at least 2” (5cm) between the back of the dispensing machine and the wall to allow for
air ow.
CAUTION!
R290 refrigerant is used in this machine. R290 is a puried form of propane and can cause a
re or minor explosion if precauons are not observed.

Related product manuals