Doc No. 006-0211-00 Rev AD Page 19 of 62
! CAUTION ! Lethal Voltages Present Inside Enclosure.
Remove power anytime the front panel of the Scout-3000 is removed.
There are potentially dangerous voltages present!
INSTALLING THE SURFACE INTERFACE EQUIPMENT
SCOUT-3000 Installation
Figure 14 shows a typical wiring and installation schematic for the ESP surface
equipment. Figure 15 describes the specific connections of a Scout-3000 to a gauge.
Connections are also detailed for the 4-20mA Current Loop and Modbus.
Figure 14. SCOUT and Suface System Wiring Diagram