15.2 Checklist for initial commissioning and commissioning
Checklist for the manufacturer/installer
T
he details relating to the items listed below must be available no later than when the
system is commissioned for the first time. However, these depend on the specific appli‐
cation (the requirements of which must be reviewed by the manufacturer/installer).
This checklist should be retained and kept with the machine documentation to serve as
reference during recurring thorough checks.
This checklist is not a substitute for initial commissioning or periodic thorough checks
by qualified safety personnel.
Have the safety rules and regulations been observed in compliance with the
dir
ectives/standards applicable to the machine?
Yes No
Are the applied directives and standards listed in the declaration of conformity? Yes N
o
Does the protective device correspond to the required PL/SILCL in accordance
w
ith EN ISO 13849-1/EN 62061?
Yes No
Is access to the hazardous area/hazardous point effectively prevented by the
monitored material?
Yes No
Have appropriate measures been taken to protect (mechanical protection) or
monit
or (protective devices) any persons or objects in the hazardous area when
protecting a hazardous area or hazardous point, and have these devices been
secured or locked to prevent their removal?
Yes No
Are additional mechanical protective measures fitted and secured against
manipulation which prevent reaching under, above, or around the ESPE?
Yes No
Has the maximum shutdown and/or stopping time of the machine been mea‐
sured, specified, and documented (at the machine and/or in the machine docu‐
mentation)?
Yes No
Are the sensors properly mounted and secured against manipulation after
ad
justment?
Yes No
Are the required protective measures against electric shock in effect (protection
class)?
Yes No
Is the control switch for resetting the protective device or restarting the machine
pr
esent and correctly installed?
Yes No
Are the outputs of the protective device integrated according to the required PL/
SILCL in accordance with EN ISO 13849-1/EN 62061 and does the integration
correspond to the circuit diagrams?
Yes No
Has the protective function been checked in compliance with the test notes of
this documentation?
Yes No
Are the specified protective functions effective at every adjustable operating
mode
?
Yes No
Are the switching elements activated by the protective device (e.g., contactors,
valves) monitored?
Yes No
Is the protective device effective over the entire period of the dangerous state? Yes No
Once initiated, will a dangerous state be stopped when switching the protective
de
vices off or when changing the operating mode, or when switching to another
protective device?
Yes No
Has the information label for the daily thorough check been attached such that
it is well visible for the operator?
Yes No