Siemens AG SPR2-310.815.01.05.02 ARCADIS Varic
02.05 CS SD 24
Final Work Steps 39
Page 39 of 48
Medical Solutions
Final work steps 0
IQ test 0
Perform IQ test according to instructions SPR2-310.820.01.xx.xx.
¹ Remove the supplied IQ test protocols from the monitor cart service compart-
ment.
Configuring the network (optional) and remote service 0
Configure the network according to the Configuration Guide, SPR2-310.843.01.01.xx.xx
and the remote connection according to Installation, Siemens Remote Service,
SP00-000.816.02.01.xx.xx.
Completing protocols 0
After completing all adjustment work steps and check measurements, the responsible
technician must sign and date the test protocols and country-specific protocols to confirm
that all values have been correctly determined and recorded.
Completing the "ARCADIS Varic Installation" protocol 0
The manufacturer of this product requires information and the legislator demands proofs
that a product delivered free of defects from the factory continues to possess the required
and certified quality properties on installation and start-up.
It is therefore absolutely necessary that the installation report with the installation and
start-up data is sent without delay after completion of the work to the address stated on
the installation report.
You will find the report in the system folder.