122/245 
Building Technologies Division  Basic Documentation LME7...   CC1P7105en 
Infrastructure & Cities Sector  17 PME73.830...  29.11.2011 
 
17.1.5  Gas valve proving 
 
Valve proving is depending on parameter 241. This is valve proving designed to detect 
leaking gas valves and, if necessary, prevent the valves from opening or ignition from 
being switched on. Lockout is initiated. 
 
Valve proving with separate pressure switch  
 
Step 1: td4 – test space evacuating. 
Gas valve on the burner side is opened to bring the test space to  
atmospheric pressure.  
 
Step 2: td1 – test atmospheric pressure. 
When the gas valve has closed, the gas pressure in the test space 
must not exceed a certain level.  
 
Step 3: td3 – test space filling. 
Gas valve on the mains side opens to fill the test space.  
 
Step 4: td2 – test gas pressure. 
When the gas valve has closed, the gas pressure in the test space 
must not drop below a certain level.  
 
Legend 
td1 Test atmospheric pressure 
td2  Test gas pressure 
td3  Test space filling 
td4  Test space evacuating 
V… Fuel valve 
P LT  Pressure switch valve proving 
 
Input/output signal 1 (ON)  
 
Input/output signal 0 (OFF)  
P LT
7105d68e/1210
P
LT
 
Figure 60: Valve proving with separate pressure 
switch  
 
Input permissible signal 1 (ON) or 0 (OFF)  
 
Valve proving can be parameterized to take place on startup, shutdown, or both. 
 
Recommendation: 
Perform valve proving on shutdown. 
 
No. Parameter 
241.00 Valve proving 
0 = OFF 
1 = ON ¹) 
242  Valve proving test space evacuating 
243  Valve proving time test atmospheric pressure 
244  Valve proving test space filling 
245  Valve proving time test gas pressure 
 
¹) Valve proving during postpurging, if P234 >0 (postpurge time) and P241.01 = 1 
 
 
Note! 
If valve proving is parameterized to take place on startup and shutdown, 
the gas valves must run through additional switching cycles. As a result, 
strain (wear) on the gas valves and the relay increases.