96/245 
Building Technologies Division  Basic Documentation LME7...  CC1P7105en 
Infrastructure & Cities Sector  15 PME73.810...  29.11.2011 
 
15.2.3  Gas direct ignition (G), 1-stage, with valve proving 
 
SV
V1
Program
G
Gas direct 1-stage, with valve proving
X7-04
LME73.000...
V2
X7-02
 
Figure 41: Connection diagram fuel train gas direct ignition (G), 1-stage, with valve proving 
 
15.2.4  Gas direct ignition (G), 2-stage, with valve proving 
 
SV
V1
Program
G
Gas direct 2-stage, with valve proving
X7-01
LME73.000...
V2a
V2
X7-02 X7-04
 
Figure 42: Connection diagram fuel train gas direct ignition (G), 2-stage, with valve proving 
 
 
Note: 
When valve proving is activated (e.g. on shutdown), the load on the valve’s 
terminals (according to chapter Technical data/Terminal rating Outputs) is 
restricted.  
 
Fuel valve 1 X7-04 pin 4/fuel valve 2 X7-02 pin 3/auxiliary output  
  Rated voltage  AC 120 V  AC 230 V 
      50/60 Hz  50/60 Hz 
  Rated current  1 A    1 A 
 Power factor  cos >0.4  cos >0.4 
 
If the terminal load (according to chapter Technical data/Terminal rating 
Outputs) is not reduced (max. rated current 2 A, cos >0.4), the design 
lifetime will be reached after about 100,000 burner startup cycles!