49/245 
Building Technologies Division  Basic Documentation LME7...   CC1P7105en 
Infrastructure & Cities Sector  10 PME71.401...  29.11.2011 
 
 
Phase 
number 
Function 
LOC  Lockout shutdown phase 
OFF  Standby, waiting for heat request 
oP1/oP:P1  Operation of first stage 
oP2/oP:P2  Operation of 2nd stage 
10  Home run 
21  Safety valve ON, air pressure switch in no-load position 
Check if POC is closed 
22  Part 1: Fan motor ON 
Part 2: Specified time air pressure switch 
            Message (timeout), stabilization of air pressure switch 
30  Part 1: Prepurge time without flame simulation test 
Part 2: Prepurge time with flame simulation test (2.1 seconds) 
38  Preignition time  
40  Postignition time, parameter 257 + 0.3 seconds 
42  Flame detection 
44  Interval: End of ignition safety time and release of load controller 
74  Postpurge time  
90  Pressure switch-min open → safety shutdown 
 
Key to phases