Building Technologies Division  Basic Documentation LME7...  CC1P7105en 
Infrastructure & Cities Sector  12 PME71.901...  29.11.2011 
 
 
Phase 
number 
Function 
LOC  Lockout shutdown phase 
OFF  Standby, waiting for heat request 
oP  Part 1: Request load controller OPEN 
Part 2: Modulation of fan motor speed toward high-fire 
Part 3: High-fire reached 
Part 4: Request load controller CLOSED 
Part 5: Modulation of fan motor speed toward low-fire 
Part 6: Low-fired reached 
10  Settling time, fan motor standby speed 
21  Safety valve ON, air pressure switch in no-load position 
Check if POC is closed, fan motor speed is reduced to 0 
22  Part 1: Fan motor ON 
Part 2: Specified time air pressure switch 
           Message (timeout), stabilization of air pressure switch 
24  Settling time, fan motor prepurge speed 
30  Part 1: Prepurge time without flame simulation test 
Part 2: Prepurge time with flame simulation test (2.1 seconds) 
36  Speed settling time, fan motor ignition load speed 
38  Preignition time  
40  Postignition time, parameter 257 + 0.3 seconds 
42  Flame detection 
44  Interval: End of ignition safety time and release of load controller 
72  Speed stabilization time, fan motor postpurge speed 
74  Part 1: Operation is ended, check if postpurging is programmed 
Part 2: Postpurge time  
80  Test space is evacuated  
81  Atmospheric pressure test  
82  Test space is filled  
83  Gas pressure test  
90  Pressure switch-min open → safety shutdown 
   
*1  Valve proving, if P241 = 1 after main ON, lockout or P234  
(postpurge time) = 0 second 
*2  Valve proving, if P241 = 1 and P234 (postpurge time) >0 second 
 
Key to phases