94/245 
Building Technologies Division  Basic Documentation LME7...  CC1P7105en 
Infrastructure & Cities Sector  15 PME73.810...  29.11.2011 
 
 
Phase 
number 
Function 
LOC  Lockout shutdown phase 
OFF  Standby, waiting for heat request 
oP  Part 1: Request load controller OPEN 
Part 2: Switching point fuel valve 2a (2nd stage) ON by actuator 
Part 3: High-fire reached 
Part 4: Request losf controller CLOSE 
Part 5: Switching point fuel valve 2a (2nd stage) OFF by actuator 
Part 6: Low-fire eached 
10  Actuator travels to the CLOSED position, home run 
21  Safety valve ON, air pressure switch in no-load position 
Check if POC is closed, actuator travels to the CLOSED position 
22  Part 1: Fan motor ON 
Part 2: Specified time air pressure switch 
           Message (timeout), stabilization of air pressure switch 
24  Opening time of actuator (timeout) 
30  Part 1: Prepurge time without flame simulation test 
           Valve proving when… 
           parameter 241 = 1 after power ON lockout, or 
           parameter 234 (postpurge time) = 0 seconds 
Part 2: Prepurge time with flame simulation test (2.1 seconds) 
36  Closing time of actuator (timeout) 
38  Preignition time  
40  Postignition time, parameter 257 + 0.3 seconds 
42  Flame detection 
44  Interval: End of ignition safety time and release of load controller 
72  Opening time of actuator (timeout) 
74  Part 1: Operation is ended, check if postpurging is programmed 
Part 2: Postpurge time  
            Valve proving when… 
            parameter 241 = 1, and 
            parameter 234 (postpurge time) >0 seconds 
80  Test space is evacuated  
81  Atmospheric pressure test  
82  Test space is filled  
83  Gas pressure test  
90  Pressure switch-min open → safety shutdown 
   
*)  During the actuator’s running phases, the actuator’s feedback signal must fir
be OFF, then ON 
*1  Valve proving when P241 = 1 after mains ON, lockout or P234 (postpurge 
time) = 0 seconds 
*2  Valve proving when P241 = 1 and P234 (postpurge time) >0 seconds 
 
Key to phases