MOBILETT Plus / - E/ - M SPR8-215.898.01 Page 6 of 6 Siemens-Elema AB
Rev. 05 01.02 SPS-UD Solna, Sweden
7 - 6 Capacitor bank
• If no malfunction can be detected, reinstall the module and check the remaining modules
according to the instructions above. Start with the item:"Remove the cap...".
• Reinstall the main bars and connect them.
• Tighten all screws and nuts on the upper side of the capacitor module with a torque of
3 Nm and all screws and nuts on the under side with a torque of 1 Nm.
• Reattach the left and right and rear covers.
• Connect the power plug and switch off S10 on D7.
• Switch on S 1:1 on D1.
• Read the information about the formation program P06 in section "P06 - Capacitor
formation" if you have replaced one or more capacitors.
• Switch on the main power switch.
• Perform a formation with program P06.
• Switch off S 1:1 on D1.
• Reattach the top cover.