EasyManua.ls Logo

Siemens PM330 - Acceptance Test STO

Siemens PM330
150 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix
A.4 Acceptance test/configuration test
Power Module PM330
Hardware Installation Manual, 12/2018, A5E32844552B AF
135
A.4.1
Acceptance test STO
Table A- 4 Procedure for the STO acceptance test
Status
1.
The inverter is ready for operation
• The inverter signals neither faults nor alarms.
• STO is not active (r0002 ≠ 44).
(e.g. R0002 = [31] Ready for switching on – set "ON/OFF1" = "1/0" (p0840)
2.
Switch on the motor
2.1. Enter a speed setpoint ≠ 0.
2.2.
Switch on the motor (ON command).
2.3.
Check that the correct motor is running.
2.4. Check the status of the safety relay LEDs
(here in the example, a 3SK1112-… or 3SK112x-…)
• LED (1) DEVICE = green
• LED (2) OUT = green-> 3SK1 output circuit closed
• LED (3) IN = green-> 3SK1 switch-on (close) conditions satisfied
– Input circuit closed
– Feedback circuit closed
– Start button where necessary actuated
• LED (4) SF = OFF

Table of Contents