Connecting up, switching on
4.2 Line, motor and DC link connection
Power Module PM330
Hardware Installation Manual, 12/2018, A5E32844552B AF
37
The diagram shows the layout
of line and motor terminals and
terminal strip X9.
Optionally, the line connection
can be established using the
"Installation set for line
-side
cable connection, left", see
Chapter "
Installation set for line-
side cable connection, left
43)".
Tightening torques for the line,
motor and PE terminals (M12):
50
Nm
The cable entry protection (
①)
must be broken out correspon
d-
ing to the diameter of the cable
to be introduced.
After connecting, the covers of
the line and motor terminals
must be reinstalled (tightening
torque: 6
Nm).