EasyManua.ls Logo

Siemens SIMATIC IPC477E PRO - Page 54

Siemens SIMATIC IPC477E PRO
178 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning the device
5.1 Notes on commissioning and operation
SIMATIC IPC477E PRO
54 Operating Instructions, 08/2017, A5E39912462-AA
Notes on operation
Note
During the boot process...
Make sure that there are no conductive liquids on the touch screen during startup.
Do
not
touch the touch screen during startup.
The device automatically calibrates the touch screen during startup.
Requirement
The terminal compartment cover of the PRO device is open.
The device is connected to the power supply.
The protective conductor is connected.
The connection cables are plugged in correctly.
The following hardware is available for initial commissioning:
One USB keyboard
One USB mouse
Note
Switching on the PRO device
An external on/off switch is
recommended to avoid having to continually open the terminal
compartment cover.

Table of Contents

Related product manuals