Hardware Overview
1-17
SIMATIC PCS 7 OSx 4.0.0 Hardware (PA RISC)
1.8 Site Planning Checklist
Use
the following checklist when planning your system site.
Prepare a storage area for the equipment cartons.
Plan a route for moving the equipment cartons to the storage or
operator area.
Determine the space requirements for storing media and spare parts.
Determine the space requirements for installing your command center
or individual subassemblies.
Determine the power requirements for your system.
Plan and implement a grounding system.
Prepare the control room environment according to specifications.
Determine the lighting requirements for the control room.
Determine the flooring requirements for the control room.
Plan a fire protection system for the control room.