EasyManua.ls Logo

Siemens SIMATIC PN/CAN LINK

Siemens SIMATIC PN/CAN LINK
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
9.1 Commissioning the PN/CAN LINK
SIMATIC PN/CAN LINK
96 Operating Instructions, 03/2022, A5E39895388-AC
6. Set SIMATIC CPU to "RUN" operating state. The corresponding configuration data is
automatically downloaded from the S7-CPU to the PN/CAN LINK.
7. When the S7 program sets the control bit in the cyclic IO image to "1", the left "RUN" status
LED on the PN/CAN LINK lights up green and signals that the device is in error-free operating
state.
Note
In "CANopen Manager" mode, bit 2 must also be set to "1" in the control information
transmitted from the S7
-CPU to the PN/CAN LINK (see Control and status information
(Page
46)).
Result
Successful commissioning of the PN/CAN LINK.

Table of Contents

Related product manuals