Table 9-2 Control Module: Checklist for preventive maintenance work
Maintenance Carried out by: Frequency Comments
Replace the UPS battery. Owner Siemens
service per‐
sonnel
When the relevant
message is output.
Relevant for option L53
Check the software. Siemens
service per‐
sonnel
After every parameter
modification, and ev‐
ery five years there‐
after
Test the insulation. Siemens
service per‐
sonnel
Every two years "Bender insulation" test mode
9.4.3 Visual inspections
9.4.3.1 Equipment for visual inspections
You require the following basic equipment to carry out the visual checks and maintenance work:
● Mirror
● Flashlight
● Torque wrench for tightening screws
Damage due to contamination and dirt
Contamination and dirt can damage the device.
● Visually inspect the equipment at least once per year. For more information, please refer to
the section "Visual inspections".
● Dust deposits inside the cabinet unit must be removed at regular intervals (or at least once
a year) by qualified personnel in line with the relevant safety regulations.
Note
The actual intervals at which maintenance procedures are to be performed depend on the
environmental and operating conditions. Define maintenance intervals that reflect your plant-
specific environmental and operating conditions and meet your availability requirements. When
doing so, take the prescribed maintenance intervals into consideration, as well as the
instructions for repairing and replacing installed components.
9.4.3.2 Checking the isolating clearances
● Slight, dry, non-conducting contamination is permitted.
● Remove contamination caused by dust in conjunction with high humidity.
Maintenance
9.4 Preventive maintenance
SINAMICS PERFECT HARMONY GH150 6SL3825
96 Operating Instructions 05/2020