Mobility, Intelligent Traffic Systems
Sopers Lane, Poole, Dorset, BH17 7ER
Security classification Unrestricted Page 87 of 92
Version 3 Status Issued
Last Editor Alan Doyle Date 05-Oct-2017
Document Name Stratos Outstation General and ICM Handbook Document No. 667/HB/52250/000
Copyright © Siemens plc 2014. All Rights Reserved. Mobility and Logistics is a division of Siemens Plc
e. Run the system test scenario (see Table 29) and check that results are as
expected: Tester
f. Carry out configuration of facilities and start as required (e.g. UTMC OTU,
MOVA, Controller Monitor – see related documents for details)
g. Check the Fault Table for faults & Notifications before leaving site
14. Complete the Stratos Outstation UTMC Commissioning data (667/CI/52250/000)
leaving the form in the controller cabinet for future reference.
15. Complete the Stratos Outstation SAT Sheet for customer sign off
(667/CI/52250/002)