Section 6 – Additional Procedures Loading/Unloading
6.3 Loading/Unloading
Know and heed all national, state/provincial and local
rules which apply to transporting of MEWPs.
Only qualied/competent personnel shall operate the
MEWP during loading/unloading.
Be sure vehicle capacity and loading equipment
hoists, chains, straps, etc., are sufcient to withstand
maximum MEWP weight.
The transport vehicle must be parked on a level
surface and must be secured to prevent rolling while
MEWP is being loaded or unloaded.
6.3-1 Loading and Tie-down
1. Lock turret using turret transportation lock (refer
to Section 6.3-2).
2. Turn key switch to off position and remove
key before transporting.
3. Turn main power disconnect switch to off
position.
4. Chock MEWP wheels (if necessary).
5. Remove all loose items.
6. Anchor down MEWP to transport surface using
tie-down points (refer to Figure 24).
7. Secure boom from side-to-side movement using
lower platform mount between boom end and
platform. Do not use excessive downward force
when securing boom section.
8. Place block underneath platform rotator and
gently lower rotator onto block and secure in
place. Strap must be secured underneath hoses
and cables to avoid damage to MEWP (refer to
Figure 25). Do not use excessive downward
force when securing platform.
WARNING
Inspect MEWP for loose or unsecured items.
NOTE
For loading and unloading using a winch line,
refer to Section 6.1.
Figure 24 Tie-down Points
Figure 25 Platform Tie-down