4 Scope of Delivery SMA Solar Technology AG
18 SCCPXT-IA-D7-en-42 Installation Manual
4 Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage. Contact your distributor if the scope of
delivery is incomplete or damaged.
Figure4: Components included in the scope of delivery
Position Quantity Designation
A 1 Sunny Central
B 1 Ventilation plate
C5Kick plate
D 1 LV/HRC fuse handle*
*for DC fuse option
E 1 Non-woven abrasive
F 1 Desiccant bag
G68 Screw
H68Nut
I136Fender washer
K136Spring washer
L 80 Cable tie
M 3 Cable support sleeve (9.5 mm to 16 mm)
N 1 Installation manual, operating manual, circuit diagram, commissioning report
Position of the LV/HRC fuse handle
With the DC fuse option, the LV/HRC fuse handle is located on the inside of the right door of the interface cabinet.