SMA Solar Technology AG 15 Commissioning
Installation Manual SCCPXT-IA-D7-en-42 73
15.8 Mounting the Panels and Protective Covers
Figure28: Position of the protective covers in the Sunny Central
Procedure:
1. Attach all cables to the cable support rail using cable ties.
2. Fasten all protective covers in place (torque: 5 Nm).
3. Fasten the grounding cables to the panels of the interface cabinet and the kick plates (torque: 8 Nm to 10 Nm).
4. Ensure that the grounding cables are securely in place.
5. Attach the panels at the prescribed positions.
6. Attach the panels to the Sunny Central using a Torx screwdriver (torque: 2 Nm to 3 Nm).
Position Designation
A Protective cover